United
Kingdom
A maturing pipeline, the National Wealth Fund, and a broad screening perimeter under the National Security and Investment Act.
Summary of investment context
The United Kingdom continues to pursue a strategic programme to attract private capital. It has a well-established framework in respect of both government support mechanisms to encourage private capital investment into its national infrastructure and the regulatory landscape in relation to those investments. Building on this, there have been several recent developments designed to enhance competitiveness, streamline regulatory processes and increase the transparency of the infrastructure project pipeline. We set out below the key features of the UK market, explaining how the various support mechanisms contribute to favourable risk allocation and predictable investment returns and exploring recent and upcoming changes and the impact that these are likely to have on investment in the infrastructure sector.
Key Government policies and regulation attracting private capital
Economic regulation
The Regulated Asset Base (RAB) model is an established feature of UK infrastructure financing. Designed to balance value for money for consumers with long-term stability for investors, it has been used since the 1980s to support the operations and maintenance of utilities like water, electricity networks and gas, and, more recently, to provide asset-specific support for the construction of new build projects and schemes.
Under a RAB model, an economic licence determines how an operator’s “allowed revenue” is calculated. This is typically based on economic conditions including pass-through costs, performance incentives, and in the case of capex, a rate of return for capital invested over an asset’s life. “Allowed revenue” is generally recovered from consumers or other infrastructure users through regulated charges or levies. Licences are overseen by independent sector regulators, whose functions include safeguarding value for money for consumers and taxpayers while maintaining investor confidence Regulators conduct periodic price control reviews during the licence term. Disputes are governed by the licence and the relevant sector legislation or codes and may be appealed to the Competition and Markets Authority (the UK government department responsible for investigating mergers, enforcing consumer law, and regulating markets to ensure fairness).
RAB models are designed to attract private capital by offering stable, regulated returns and long-term revenue visibility. Traditional RAB models are applied to operational, multi-asset businesses such as energy networks, ports and water companies. More recent RAB models support projects during both construction and operation, such as Thames Tideway Tunnel, the Sizewell C nuclear plant and carbon dioxide transport and storage infrastructure. For newer projects, RAB models are invariably combined with government support packages to mitigate risks less amenable to private sector management (such as political shutdown) and to improve value for money for consumers by reducing investor risk premia.
Effectiveness: RAB models enable projects to secure lower-cost, investment-grade debt financing, significantly reducing the overall weighted average cost of capital (WACC) and making funding support for projects more attractive. For new build projects, equity investors may earn a return during the construction phase improving Internal Rate of Return (IRR) by not having to wait for the project to earn revenue until it is in operation. This in turn benefits consumers and taxpayers by reducing the significant interest costs that otherwise build-up during construction. Government risk-sharing arrangements in relation to specific risks better managed by the public sector, such as insurance insufficiency, political shutdown or change of law, can be combined with RAB models to further enhance their effectiveness.
Challenges: The cost of regulated revenues is ultimately recovered through consumer bills (whether directly through tariffs or indirectly through levies) a dynamic that can generate political sensitivity, particularly where bills are already under pressure. The model requires an expert, independent regulatory body to function effectively when balancing competing objectives:
to maintain investor confidence by allowing revenues that support stable returns; and
to maintain resilience to significant public and political scrutiny in economically critical sectors like water and energy, where perceptions of under-performance or over-recovery can elevate regulatory and reputational risk.
Revenue support and tax incentives
Revenue support
Various UK infrastructure assets benefit from market and revenue support regimes, particularly in the electricity sector. These schemes have been very successful in mobilising capital, such as the Renewables Obligation Certificates (ROCs) scheme, which continues to support returns for operational renewable projects (despite being closed to new entrants), and the Capacity Market (CM), which continues to incentivise investment in ongoing peaking and storage plant availability by guaranteeing returns.
Most significantly, the Contracts for Difference (CfD) mechanism, introduced in 2014-15 to support low-carbon power generation provides revenue certainty through an index-linked "strike price" for electricity dispatched. By insulating generators from the wholesale price volatility CfDs enable more accurate financial modelling reducing cost of debt and improving return visibility for equity investors, by offering inflation-linked price certainty.
Effectiveness: CfDs have played a central role in the UK’s low-carbon build out, supporting projects such as Hinkley Point nuclear power station, onshore and offshore wind farms and solar projects. Since 2014, CfDs have underpinned more than 39 GW of low-carbon electricity capacity. In 2025, alone CfDs were secured for a further 14.7 GW of generation capacity across offshore wind, onshore wind, solar and tidal technologies. The CfD approach has been adapted to support power plants deploying Carbon Capture Use and Storage (CCUS) and low carbon hydrogen production combining availability payments with variable revenue support analogous to a strike price1.
Challenges: Whilst the CfD scheme has been relatively uncontroversial, there remains a risk of politically-driven change if sustained low wholesale prices increase the cost to consumers. For projects with significant capital expenditure and long construction periods (such as nuclear), the CfD model has proven less effective at attracting investment as it provides no revenue support until the asset is operating.
Tax incentives
The UK Government recognises the tax system as an “essential component” of its growth and industrial strategy.2 The Corporate Tax Roadmap, published alongside the Autumn Budget 2024, committed to a stable and predictable tax environment, capping corporation tax at 25% and maintaining key features of the UK’s capital allowances regime.3 Capital allowances enable businesses to deduct capital expenditure from their taxable profits.4 Given the nature of infrastructure projects, capital allowances are very important and typically the most relevant reliefs for private capital investment in infrastructure are plant and machinery and structures and buildings allowances.
Plant and machinery allowances: Businesses may opt to claim an annual investment allowance of up to £1 million. Businesses may also claim first-year and writing-down allowances of varying rates depending on the category of assets, but in some cases these can amount to full expensing in the year of purchase.
Structures and buildings allowances: A 3% annual straight-line relief over 33⅓ years is available on eligible construction and renovation costs for commercial buildings and infrastructure.
Businesses investing in designated Freeports and Investment Zones may also claim enhanced capital allowances and other tax reliefs, such as higher-rate structures and buildings allowances of 10% straight-line annual deduction over 10 years.5
Other capital allowances exist for expenditure on R&D, know-how, patent rights, extracting minerals, dredging and renovating unused business premises in disadvantaged areas of the UK.6
Capital allowances are not available for predevelopment expenditure which is not “on” qualifying assets. This can result in tax relief for such expenditure not being available. However, in response to case law in this area, the UK Government has indicated it may consult on this.7
To provide greater confidence for investment in large-scale infrastructure projects, the UK Government is scheduled to launch an Advance Tax Certainty Service (ATCS) in July 2026.8 The ATCS allows businesses to obtain a binding advance clearance from HMRC on the application of various UK taxes for new investment projects expected to generate at least £1 billion of UK expenditure.
The ATCS aims to reduce risk and financing costs for major investors over project lifecycles, with clearances expected to be binding for five years, and renewable for a further five years. Eligibility for a clearance extends beyond the entity incurring UK expenditure to any controlling persons, consortium members, joint venture participants, or partners in a partnership that exercise control over that entity.
For investors, the UK has a favourable holding company taxation regime, including a dividend exemption, no withholding tax on outbound dividends, and an exemption for gains on disposals of substantial shareholdings in trading groups. In addition, certain types of investors can access a broader exemption on gains with respect to disposals on substantial shareholdings more generally (i.e. even where the underlying business is not a trade), and the Qualifying Asset Holding Company (QAHC) regime provides for exemptions on gains, as well as no withholding tax on outbound interest and certain other reliefs.
Government investment
The UK government offers significant direct funding support for new infrastructure deployed either alongside or independently of RAB and CfD schemes. Support may take the form of direct equity investments, loan guarantees or tailored technology-specific solutions. By assuming certain project risks and/or taking a direct commercial interest particularly for 'first-of-a-kind', strategically important or large-scale and capital-intensive projects government participation can increase the attractiveness of such investments to private capital.
Alongside bespoke investments such as the Government’s 44.9% equity stake in the Sizewell C nuclear project, a more formalised approach has emerged through the National Wealth Fund (NWF), launched in October 2024. Building on the former UK Infrastructure Bank (UKIB), the NWF operates as an investment bank with a total capitalisation of £27.8 billion, mandated to catalyse private investment across clean energy and the wider industrial strategy, including digital technologies, transport, and advanced manufacturing infrastructure. £5.8 billion of its capital is specifically targeted towards hydrogen, green steel, carbon capture, gigafactories, and ports.
Complementing the NWF is Great British Energy (GBE), a publicly owned clean energy company established in 2025 working alongside Great British Energy – Nuclear (GBE-N) to support the development of new electricity capacity. Backed by £8.3 billion of initial funding, GBE partners with the private sector to co-invest in local and community energy, onshore projects on public land, deeper-water offshore projects and related supply chains. GBE operates as both an energy developer and a strategic investor: it takes lead positions in asset-owning and operating entities, deploying capital not merely to generate returns but to catalyse broader industrial growth and build sectors with lasting foundations.. As part of its strategy, GBE is backing community and local energy projects with up to £1 billion in investment through its Local Power Plan.
Government also offers formal schemes to support new technologies, through avenues such as: Horizon Europe, a research and innovation programme, UKRI Infrastructure Fund, which invests in infrastructure targeted at tackling climate change and societal issues; and the UK Space Agency Specific Funding.
Policy and operational regulation
Lengthy and unpredictable consenting processes remain a key challenge for UK infrastructure investment. The government is implementing a range of reforms to address this, including through the Planning and Infrastructure Act 2025 (which received Royal Assent on 18 December 2025) and the creation of the DEFRA Infrastructure Unit — a dedicated body established within the Department for Environment, Food and Rural Affairs to identify and resolve environmental planning obstacles early in the development process for major projects, with more complex cases escalated to a DEFRA Infrastructure Board. The Unit reflects recognition that environmental consenting, historically a significant source of delay for energy and transport projects, requires proactive and specialist engagement rather than sequential procedural review. Under the same legislative framework, a single Lead Environmental Regulator (typically the Environment Agency) is appointed for significant projects, replacing the fragmented multi-body engagement that has added time and cost to the consenting process:
Mandatory review of National Policy Statements9 at least every five years;
Removal of the statutory pre-application consultation requirement, the formal process by which applicants for development consent were previously required to consult specified statutory consultees, local authorities and members of the public before lodging an application, a process that in practice frequently extended to two to three years, replaced by published guidance from the Secretary of State, which is anticipated to encourage consultation on a voluntary basis. Applicants will still be required to notify certain statutory stakeholders at the point at which the development consent order ("DCO") application is lodged.;
Tighter focus of examinations on principal issues; and
Restrictions on certain legal challenges.
Further sector-specific streamlining is underway, a key example being the Government’s March 2026 commitment to implement all 47 recommendations of the Nuclear Regulatory Taskforce, designed to address the “radical reset” needed to speed up deployment of nuclear power capacity envisaged in the Government’s 2030 Clean Power Action Plan10.
Public Private Partnership
The Public Private Partnership (PPP)/Private Finance Initiative (PFI) model has historically provided a structured opportunity for investors to earn stable, long-term returns. By assuming specific construction and operational risks that they are well-equipped to manage, investors gain access to a predictable stream of payments from the public sector, creating a de-risked and attractive investment profile. These models involve long-term contracts (25-30 years or more) where the private sector undertakes comprehensive design, construction, financing, and/or operation of infrastructure assets, assuming a substantial portion of the project risk. As of March 2024, for example, there were 665 Private Finance Initiative (PFI) contracts with a capital value of £50 billion (79% of the value relating to social infrastructure and 21% concerning economic infrastructure)11 in the UK. The UK government formally withdrew from PFI in 2018, concluding it had no further role, and has not introduced an equivalent replacement model. Investors have called for a PPP framework to be reinstated, and the government has been slow to respond. The absence of a recognised, consistent model for public and private sectors to work together represents a structural barrier to investment and a source of uncertainty, particularly for greenfield projects.
Effectiveness: PPP/PFI models offer stable, long-term revenue streams once assets are operational, supporting investor certainty and offering efficient risk allocation. They also incentivise innovation in design, construction and operational practices to minimise whole-life costs. The value-for-money credentials of the model have been supported by independent analysis: the National Audit Office has concluded that UK PFI projects have, on balance, delivered value for money.12
Challenges: PPP/PFI models have faced criticism for complexity, high transaction costs, and perceived lack of transparency, as well as public concerns around "private profit from public services" There is also potential for inflexibility within long-term contracts, difficulties in accurately assessing value and challenges around maintenance of assets at the end of the term.
Infrastructure pipeline
Successive governments have recognised that transparency and long-term visibility of the infrastructure project pipeline are an important element of attracting sustained private investment. Two initiatives are central to the current government's approach: a regularly updated, interactive Infrastructure Pipeline designed specifically with investor needs in mind; and a comprehensive 10-Year Infrastructure Strategy setting out the government's investment priorities and pro-business policy framework.
Infrastructure Pipeline – interactive and up-to-date tool designed for investors
The principal instrument is an interactive online tool — the National Infrastructure and Construction Pipeline (the Pipeline) — managed by the National Infrastructure and Service Transformation Authority (NISTA). The Pipeline provides a forward-looking, 10-year overview of significant public and private infrastructure projects including information on government support where publicly available.
Updated every six months and improved based on the feedback, the most recent release (March 2026) details 734 projects covering £718 billion of investment over the next decade, out of which £252 billion will be publicly financed and £466 billion privately or jointly financed. Coverage spans energy (£366 billion); transport (£115 billion); health and social care (£79 billion); and water & wastewater (£64 billion). Projects are included above defined value thresholds and span all stages of development. The Pipeline is presented as an interactive online tool, with downloadable data on project status, anticipated spend and delivery timelines.
Challenges
Execution gap: while the Pipeline concept is well-intentioned, investor feedback indicates execution has not yet matched ambition. Notably, specific project-level detail on private investment opportunities, capital requirements and delivery timelines are in certain aspects absent from Pipeline updates.
FDI accessibility: the Pipeline is accessible primarily to UK-based audiences; its format and content do not effectively serve international investors seeking to assess FDI opportunities which is a significant omission given the UK Government's stated goal of attracting global capital.
Greenfield investment gap: the combination of limited project visibility and the absence of a functioning PPP model make the UK particularly unattractive for greenfield private investment at present.
Strategic Vision
Alongside the Pipeline the government has articulated a clear strategic framework through its UK Infrastructure: A 10 Year Strategy and the wider industrial strategy set out in the Invest 2035 green paper. The strategy commits to deploying at least £725 billion over the next decade to drive growth and reduce barriers to private sector participation. The strategy adopts a deliberately pro-business orientation, covering the full spectrum of economic and social infrastructure. It is designed to be refreshed every two years with the next update in 2027.
Due to devolution the UK Infrastructure Strategy primarily covers England and areas of UK government responsibility. Scotland, Wales, and Northern Ireland publish their own infrastructure plans requiring investors to consult multiple sources for a UK wide view. NISTA aims to improve integration with these devolved pipelines to provide a more cohesive picture of UK-wide infrastructure investment opportunities over time.
Sector-specific plans, such as the Clean Power 2030 Action Plan for the electricity sector, and the January 2026 white paper, A New Vision for Water further enhance visibility and co-ordination.
Recent legal and regulatory change
Retroactive or quasi‑retroactive change
Renewables Obligation (RO) and Feed‑in Tariff (FiT): switch from RPI to CPI indexation (2025–26) :
From April 2026 the UK government is changing the inflation indexation for legacy Feed-in Tariff (FiT) payments from the Retail Price Index (RPI) to the Consumer Price Index (CPI), with similar changes to Renewables Obligation (RO) indexation under consultation. This shift alters the inflation adjustment applied to generator payments, effectively recalibrating the expected revenue streams for projects that were developed and financed on the basis of RPI-linked returns. Both schemes are now closed to new entrants, yet many projects continue to depend on these indexed revenues well into the 2030s and 2040s.
This change is particularly noteworthy because the RO and FiT schemes were foundational to the UK's renewable energy build-out in the 2010s and were widely regarded as among the country's most stable and dependable regulatory commitments. The shift to CPI indexation which the government frames as aligning with regulatory best practice and reducing overall scheme costs, represents an alteration to the financial framework underpinning existing investments. Its effects extend well beyond a simple reduction in future returns. For projects structured around RPI-linked cash flows, the switch to CPI indexation reduces projected revenues, which in turn has the potential to erode key financial metrics, including Debt Service Cover Ratios (DSCRs) and other covenant ratios embedded in financing arrangements. A sustained deterioration in these ratios could trigger Events of Default under existing debt facilities, and in certain cases give rise to liquidity pressures for project companies. This directly affects the stability of current debt financing and, the ability of project sponsors to refinance on comparable terms when existing facilities mature causing concern for long-dated infrastructure debt.
From an equity perspective, the reduction in expected cash flows diminishes the returns available to investors, potentially rendering the risk-return profile of affected assets less attractive than when capital was originally committed. At a portfolio level, the Net Asset Values (NAVs) of portfolios holding assets that benefit from these legacy schemes may decline, with consequential effects on the pricing and attractiveness of these assets in the M&A market. This has the potential to dampen transaction activity and reduce the realisable value for investors seeking to recycle capital; a dynamic that runs counter to the government's broader objective of encouraging private capital participation in UK infrastructure. The compounding effect of this indexation change over the coming decades may be substantial and is the kind of risk to which infrastructure investors are often sensitive.
Energy Profits Levy (windfall tax) on North Sea oil & gas (from 2022; extended and increased 2024–25)
The Energy Profits Levy is a supplementary tax on the profits of UK oil and gas companies operating in the North Sea, introduced in May 2022 in response to the surge in energy prices that followed Russia's invasion of Ukraine. The Levy was subsequently increased, bringing the headline tax burden on North Sea producers to 78%. This comprises the standard Corporation Tax rate of 25%, the Supplementary Charge of 10% and the Energy Profits Levy of 38%, with certain allowances partially offsetting this burden.. The levy has been extended to at least 2030, despite being originally framed as a temporary measure. While legally prospective, the levy is widely argued to have retroactive effect in substance as it captures profits from investments which were made previously under a different fiscal assumption. Companies contend that their investment decisions were made in reliance on fiscal due diligence, and that the levy applies to cash flows from assets developed decades earlier under different fiscal terms. This is significant for infrastructure because the North Sea represents capital-intensive, long-lived infrastructure. The regime change has been widely cited as deterring new investment and accelerating decline in the basin, including in transition-relevant infrastructure such as Carbon Capture Use and Storage (CCUS) and electrification projects. The precedent it sets of a government retrospectively altering the fiscal terms applicable to long-duration assets is a concern that resonates well beyond the oil and gas sector and into broader infrastructure investment decision-making.
EV charging infrastructure: the 2030-to-2035 ICE ban delay and its reversal
The former government's decision in September 2023 to delay the ban on the sale of new purely internal combustion engine (ICE) cars from 2030 to 2035 had a material and well-documented negative impact on private investment in EV charging infrastructure. Investors and developers who had committed capital on the basis of the 2030 phase-outfaced a fundamental reassessment of the business cases underpinning those investments. The five-year extension materially slowed the projected pace of EV uptake weakening the revenue assumptions on which charging infrastructure projects had been financed. In response to the subsequent public consultation charging companies and infrastructure operators expressly cited the impact on investment and on the UK’s credibility as an investment destination as direct consequences of the policy reversal.
The current government has reversed this decision. Its April 2025 consultation response confirmed the reinstatement of the 2030 phase out of new purely ICE cars, with all new cars and vans required to be fully zero emission by 2035. However, the disruption caused by the 2023 delay was compounded by a related policy shift: the introduction of Vehicle Excise Duty (VED) on electric, zero and low emission vehicles from 1 April 2025; applying to both new and existing vehicles. EVs had previously been exempt from VED, and that exemption had formed a material component of the demand-side business case relied upon by charging infrastructure investors when modelling long-term EV penetration. The introduction of VED and the Expensive Car Supplement for EVs was widely cited by consultation respondents as dampening EV demand and eroding charging infrastructure revenue assumptions.
Taken together, the 2030-to-2035 ICE ban delay and the introduction of VED illustrate how changes to downstream demand policy (one reversed, one retained) can materially alter the business cases of EV charging infrastructure investors who committed capital in reliance on a stable and supportive regulatory framework. While re-instating the 2030 commitment restores a degree of long-term certainty the episode has left residual concerns about the durability of demand-side policy as a foundation for long-duration infrastructure investment decisions. The introduction of VED, while legally prospective in form, represents a substantive narrowing of the incentive environment within which existing charging network investments were originated and underwritten.
National Security and Investment Act 2021: retrospective call-in powers
The National Security and Investment (NSI) Act 2021 came into force on 4 January 2022, introducing a mandatory notification regime for acquisitions in 17 sensitive sectors directly relevant to infrastructure investors including civil nuclear, communications, data infrastructure, energy and transport. While the regime operates primarily on a prospective basis, it also contains significant retrospective provisions.
Specifically, the Secretary of State has power to call in for review acquisitions that completed between 12 November 2020 and 3 January 2022 — more than a year before the Act came into force. This retrospective call-in power remains exercisable for five years from commencement (i.e. until 4 January 2027), or six months from the Secretary of State becoming aware of the transaction, if later. The "becoming aware" test is subjective: public announcement or completion of a transaction does not, of itself start the clock running. A number of transactions completed and publicly announcement before commencement have already been called in under these provisions. For investors who completed acquisitions during this window (including transactions that at the time required no government approval) the NSI creates ongoing exposure to post-completion review, the imposition of remedies or, in extreme cases, unwinding orders13. Capital transactions completed under regulatory framework that included no mandatory notification or call-in powers are therefore now subject to materially altered the legal conditions for as long as the retrospective window remains open.
Notwithstanding these challenges, the United Kingdom retains a compelling and distinctive proposition for long-duration infrastructure capital. It offers a deep and liquid capital market, a common law legal system with strong contractual enforceability, a sophisticated and internationally respected regulatory tradition, and a track record of institutional innovation (from the development of the RAB model to the creation of the Green Investment Bank) that has consistently shaped global infrastructure finance practice. The government's ambition is evident: the Clean Power 2030 Action Plan, the National Wealth Fund, the pipeline of NSIP projects and the commitment to planning and permitting reform together represent one of the most comprehensive infrastructure investment programmes of any developed economy. For investors able to engage with the policy framework in depth and to work constructively with regulators and public institutions, the UK continues to offer a breadth and scale of investable opportunity, across energy transition, digital infrastructure, transport and water, that few markets can match. The direction of travel is clear; the task for government and investors alike is to ensure that the frameworks through which that ambition is delivered are applied with the consistency, predictability and institutional credibility that long-duration capital requires and that the UK has historically provided
Summary of regulatory environment
Investors in UK infrastructure must navigate three separate regulatory frameworks. First, the sweeping, nationality-agnostic National Security and Investment (NS&I) regime scrutinises sensitive sectors civil nuclear, communications, data infrastructure, energy and transport. Second, on merger control, the Competition and Markets Authority (CMA) is adopting a pragmatic, pro-growth mandate to merger control assessments, demonstrating growing receptiveness to behavioural remedies rather than defaulting to structural fixes or outright blocks. Third, underpinning both is a utility-specific regulatory environment that retains its independence, even as the government drives cross-sector harmonisation (for instance, on cost of capital and appeals processes), and is currently pursuing structural regulatory reform in certain infrastructure sectors such as water to strengthen investor confidence.
How burdensome is the FDI regime in this jurisdiction, and are there any notable trends relating specifically to infrastructure investment?
The UK’s NS&I regime is broad, capturing over 1,000 transactions annually. The regime requires a mandatory notification for acquisitions of: (i) over 25% of shares or voting rights; or (ii) voting rights that enable the acquirer to secure or prevent the passage of any class of resolution, in entities active across 17 sensitive sectors, many directly relevant to infrastructure investors, including: Civil Nuclear, Communications, Data infrastructure, Energy and Transport.14 In assessing these thresholds, shareholdings held by co-investors are combined where they are deemed to have a common purpose or joint arrangement, for example under a shareholders’ agreement or other (informal) agreement(s). Voluntary notifications may be advisable in sectors adjacent to the mandatory sectors, including where investors fall below shareholding thresholds but acquire “material influence” over the target, or for asset / greenfield deals. The regime is also nationality-agnostic; the UK Government can and does investigate and impose remedies (known as final orders) on friendly or even domestic investors.
Despite its broad scope, the UK’s approach to enforcement is relatively circumspect and only a limited proportion of transactions undergo in-depth review. In FY2025, fewer than 5% (49) of notifications were called-in for an in-depth investigation (meaning 95% (1,030) were cleared in the initial 30 working day review period), while seven non-notified deals were also called-in. Approximately a third of call-ins related to infrastructure sectors. For transactions that are called in, the review process can be opaque, unpredictable, and lengthy, often extending beyond six months which can create significant deal timing uncertainty. In FY2025, out of 52 called-in acquisitions, remedies were issued in 33% (17) of the cases, representing only c.1.5% of all notifications overall. The remedies cases involved a number in infrastructure sectors: Civil Nuclear (2), Communications (2), Data infrastructure (3) and Energy (5).15 For example, one of these cases involved KX Power’s acquisition of an 80 megawatt battery energy storage system. In granting the company an Ofgem electricity generation licence, the UK Government imposed a final order obliging KX Power to notify and obtain approval from the Government before making any changes to the power offtaker and ancillary services. This final order is in line with the Government’s focus on protecting energy security in the UK.
Looking ahead, the UK Government will continue to balance its ambition to attract investment and conduct proportionate, efficient reviews with the need to protect critical national infrastructure. Planned reforms will introduce exemptions for certain low-risk internal reorganisations but will also expand the regime to include additional key infrastructure such as water and third-party operated data centres (among others).16 As a result, while intervention is relatively limited, UK infrastructure transactions will continue to face scrutiny and deal planning may need to factor in the potential for lengthy in-depth review.
What is the latest public policy direction for merger control in this jurisdiction, particularly regarding any trends relevant for infrastructure investment?
The UK’s merger control landscape, overseen by the CMA, is in a transitional period marked by several key developments relevant for infrastructure investors:
The growth agenda: the UK Government’s focus on economic growth has prompted a recalibration of enforcement priorities and the imperative to “not get in the way of investment” is reflected in the CMA’s new “4Ps” framework: pace, predictability, proportionality and process. As part of this approach:
the CMA has adopted a more domestically orientated approach, including a “wait‑and‑see” stance on certain global mergers meaning that, where review by other agencies might be sufficient to cover competition concerns relating to the UK, the CMA may be prepared not to open a full review at the outset; and
the CMA has signalled greater openness to efficiencies arguments and behavioural remedies, including long‑term network investment commitments or guaranteed third‑party access to infrastructure. For example, in Vodafone/Three – a joint venture between two of the UK’s four major mobile telecommunications networks – the CMA accepted the merging parties’ commitment to upgrade the merged company’s 5G network over eight years, with the CMA and industry regulator, Ofcom, overseeing compliance with this commitment. This network investment commitment was combined with short-term retail and wholesale customer commitments in the initial years of the investment period.
Clarifying jurisdictional thresholds: the UK Government is seeking to clarify the jurisdictional thresholds – including the interpretation of the “share of supply” and “material influence” tests – to provide investors with greater certainty. However, even with these changes, the UK’s regime – which is voluntary, unlike most others – will continue to be governed by one of the more flexible sets of jurisdictional rules found worldwide.
Potential for increased political influence: the UK Government has recently consulted on abolishing the independent panels responsible for Phase 2 merger decisions replacing them with CMA Board sub-committees (potentially including CMA executives, non-executives and external experts). The Government’s justification is to enhance the CMA Board’s accountability to Parliament, though commentators are concerned that the loss of independent decision-making will leave individual cases more susceptible to political pressure.17
New energy network merger regime: the UK Government recently introduced an energy network mergers regime mirroring the existing water regime. This regime requires the CMA to assess whether a transaction could undermine Ofgem’s ability to benchmark companies effectively. Iberdrola / ENW, a merger between two energy networks was recently considered under this regime and was cleared unconditionally at Phase 1.
Overall, these (potential) reforms indicate a shift toward a more investor-friendly – but potentially more political – regulatory environment that seeks to balance effective merger control with the need to provide confidence for long‑term infrastructure investment.
What is the record of sector-specific regulators overseeing infrastructure sectors in this jurisdiction and are there any key or upcoming developments to highlight?
UK sector‑specific regulators overseeing key infrastructure sectors – including Ofgem (energy), Ofwat (water), Ofcom (telecoms), the Civil Aviation Authority, the Office of Rail and Road, and the Northern Ireland Authority for Utility Regulation – have a longstanding reputation for independence and technical expertise. They operate within mature statutory frameworks designed to provide stability and support sustained private investment in essential infrastructure.
These regulatory regimes play a central role in shaping investment incentives, particularly in sectors subject to periodic price controls. The UK Regulators Network18 has highlighted the importance of cross‑sector consistency, and the Government has indicated that it intends to align aspects of regulatory methodology across sectors – including, notably, adopting a more consistent approach to setting the cost of capital.
Among the regulated sectors, water has attracted particular scrutiny in recent years. Following an independent review, the Government announced plans to abolish Ofwat and replace it with a new regulator with broader responsibilities, consolidating functions currently performed by Ofwat, the Environment Agency, Natural England and the Drinking Water Inspectorate. Alongside these structural changes, the Government is prioritising reforms aimed at improving the sector’s long‑term resilience and attractiveness to infrastructure investors.19 The Government has also recently proposed a number of changes to energy sector regulation, including the removal of the stand‑alone reference to competition as one of Ofgem’s statutory duties in order to avoid “a narrow focus on competition for its own sake”. However, it has recommended retaining Ofgem’s concurrent competition powers, alongside granting it direct powers to enforce consumer protection laws.
A further feature that supports investor confidence is the ability to appeal price controls and licence modifications to the CMA and, in some sectors, the UK’s specialist competition court, the Competition Appeal Tribunal. Each sector has its own statutory framework governing how appeals operate, resulting in differences across sectors. The Government has stated that it intends to make these processes more consistent – for example, by replacing the water “redetermination” model with an appeal regime aligned with other utility sectors. Recent judicial review of the CMA’s 2021 electricity transmission and gas distribution price control (RIIO‑2) appeals has also clarified the standard of review the CMA must apply when determining whether a regulator’s decision is “wrong”, providing further procedural certainty for investors.20
- Mandatory?
- Yes21
- Voluntary?
- Yes22
- Review period(s)
Once filing confirmed complete:
(i) 30-working day initial period.
(ii) 30 working day “call-in period” extendable by 45-working days23
- Number of notifications
- 114324
- Non-notified deals called-in
- 725
- In-depth investigations
- 5626
- Remedies cases
- 1727
- Blocked cases
- 128
- Abandoned cases
- 529
Endnotes
See – the Department for Energy Security & Net Zero, Contracts for Difference (CfD) Allocation Round 7: results (2025) - Contracts for Difference (CfD) Allocation Round 7: results - GOV.UK↩︎
See pages 84-87 of ‘The UK’s Modern Industrial Strategy’ CP 1451 (November 2025): https://assets.publishing.service.gov.uk/media/69256e16367485ea116a56de/industrial_strategy_policy_paper.pdf.↩︎
See the “Corporate Tax Roadmap” (October 2024): https://assets.publishing.service.gov.uk/media/6721199c4da1c0d41942a8bd/Corporate_Tax_Roadmap.pdf.↩︎
The UK capital allowances regime is governed by the Capital Allowances Act 2001.↩︎
See further UK Government guidance at https://www.business.gov.uk/invest-in-uk/investment/freeports-in-the-uk/ and HMRC ‘Investment Zones information pack’ (published in December 2025) at https://assets.publishing.service.gov.uk/media/694017b1cfacd5e888491fdc/Investment_Zones_Pack_Dec_2025.pdf .↩︎
See further HMRC guidance on claiming capital allowances: https://www.gov.uk/capital-allowances.↩︎
See the recent UK Supreme Court decision in Orsted West of Duddon Sands (UK) Limited (now named Orsted Schroders Greencoat WODS Holdco Limited) and others v Commissioners for His Majesty's Revenue and Customs [2026] UKSC 12 and the potential HMRC publication on the consultation on the tax treatment of predevelopment costs: https://www.gov.uk/government/news/tax-treatment-of-predevelopment-costs-update-on-consultation. This publication was paused following the Orsted West Court of Appeal decision but may be raised again following the Supreme Court decision.↩︎
Legislation was introduced in the Finance Act 2026. HMRC published draft guidance on the ATCS on 26 November 2025: https://www.gov.uk/government/publications/advance-tax-certainty-service-major-investment-projects-with-certainty-in-advance/advance-tax-certainty-service.↩︎
National Policy Statements ("NPS") are government policy documents, designated by the relevant Secretary of State, that set out the framework within which the Planning Inspectorate examines applications for Nationally Significant Infrastructure Projects ("NSIPs"). Each NPS covers a specific infrastructure sector (including energy generation, electricity networks, national road and rail networks, and water resources) and establishes the government's assessment of the need for that category of infrastructure. Their practical significance is that an NPS designation creates a policy presumption in favour of the relevant infrastructure type, meaning that individual applicants are not required to re-establish the need case from first principles; the examination focuses instead on the specific impacts and merits of the project in question. Where an NPS is outdated, that presumption is weakened and legal challenge risk increases — a material concern for investors whose financing assumptions depend on consenting certainty. The Planning and Infrastructure Act 2025 addresses this by introducing a statutory requirement for each NPS to be reviewed at least once every five years.↩︎
See the Department for Energy Security and Net Zero, ‘Building our nuclear nation: government response to the Nuclear Regulatory Review 2025’ (13 March 2026);↩︎
See the UK Government's PFI and PF2 projects: 2024 summary data, published by HM Treasury and the Infrastructure and Projects Authority (IPA). https://www.gov.uk/government/publications/pfi-and-pf2-projects-2024-summary-data↩︎
National Audit Office. (2018). PFI and PF2. Report by the Comptroller and Auditor General, HC 718 Session 2017–2019. 18 January 2018. https://www.nao.org.uk/reports/pfi-and-pf2/↩︎
The retrospective call-in power has been exercised in practice and has resulted in unwinding orders in a number of cases, including, on publicly reported accounts, the acquisitions of Newport Wafer Fab (Nexperia), Upp Corporation Ltd and Future Technology Devices International Ltd. Readers are referred to the government's published NSI Act annual reports and decision records for authoritative detail on individual cases.↩︎
The regime is governed by the National Security and Investment Act 2021 (NSIA) and Notifiable Acquisitions Regulations.↩︎
National Security and Investment Act 2021 Annual Report 2024-25. Note: a final order may cover more than one area of the economy. See also UK National Security & Investment Screening: A More Business-Friendly Future?.↩︎
For further information, see UK decides to reboot investment screening to protect its national and economic security in today’s volatile world and Balancing security and growth: Investment screening under the UK’s Modern Industrial Strategy | Freshfields.↩︎
Update: Freshfields’ response to the UK Government’s proposals to overhaul the competition regime | Freshfields↩︎
The UK Regulators’ Network is an association of UK regulators which was set up to enable cooperation between regulators on important issues. The Network includes several regulators relevant to the infrastructure industry including Ofgem, Ofwat, Utility Regulator (NI), Ofcom, Office of Rail and Road and Civil Aviation Authority.↩︎
For further information, see Calmer waters? The UK Government reveals its plan to reform the water sector, James Aitken, Susannah Prichard, Nick English, Kritika Rampal.↩︎
For further information, please see System re-boot: High Court turns up the voltage for UK energy appeals, James Aitken, Susannah Prichard, Kritika Rampal, Leonie Sage.↩︎
Mandatory notification required for acquisitions of over 25% and when crossing 50% and 75% thresholds of shares or voting rights in entities active across 17 sensitive sectors. Also required when the acquirer will be able to pass or block the passage of any resolution.↩︎
Voluntary notifications may be advisable in sectors adjacent to the sensitive sectors, where investors fall below shareholding thresholds but acquire material influence, and / or for asset / greenfield deals.↩︎
Timing is subject to stop the clocks if information notices issued.↩︎
See exec summary paragraph 7 of Annual Report 2024-25. Of the 1,143 notifications received, 954 were mandatory notifications, 134 were voluntary notifications, and 55 were retrospective validation applications.↩︎
See exec summary paragraph 10 of Annual Report 2024-25.↩︎
See exec summary paragraph 10 of Annual Report 2024-25. Of the 56 notifications called in 49 of these were notified acquisitions and 7 were non-notified acquisitions.↩︎
See exec summary paragraph 15 of Annual Report 2024-25. Of the 17, 11 were following a mandatory notification, 5 following a voluntary notification, and 1 involved a non-notified acquisition.↩︎
See Section 4 paragraph 4 of Annual Report 2024-25. One acquisition was subject to an order to unwind.↩︎
See exec summary paragraph 14 of Annual Report 2024-25. Of the five withdrawals, four were following a mandatory notification, and one involved a non-notified acquisition.↩︎
See page 24 CMA Annual Performance Report. Note: CMA Annual Report only discusses “cases considered” rather than numbers of notifications.↩︎
See page 24 CMA Annual Performance Report.↩︎
See page 24 CMA Annual Performance Report.↩︎
See page 24 CMA Annual Performance Report.↩︎
See page 24 CMA Annual Performance Report. One case was abandoned during the course of a CMA investigation.↩︎