07Jurisdiction · Spain

Spain

Renewables leadership, Recovery Plan momentum, and a foreign-investment regime under Law 19/2003.

Foreign investment screening
Law 19/2003
FDI authorisation regime
Merger control
CNMC
Mandatory above thresholds
Part One
Investment landscape
Government policies, pipeline transparency, risk allocation, and recent legal and regulatory change.

Summary of investment context

Spain has developed a mature and well-structured framework for attracting private capital into national infrastructure. Centred on a regulated asset base model for energy networks, competitive auction-based revenue support for renewables, a long-established concession tradition and a growing suite of public co-investment instruments, the framework combines contractual certainty with multi-year revenue visibility. Recent legislative reforms accelerate and expand the concession pipeline, introducing new investment vehicles and seek to sharpen Spain's competitiveness for long-duration private capital. We set out below the key features of the Spanish market, explaining how the various support mechanisms contribute to favourable risk allocation and predictable investment returns, and exploring recent and upcoming changes and the impact these are likely to have on investment in the infrastructure sector.

Key Government policies and regulation attracting private capital

Economic regulation

Spain operates a Regulated Asset Base ("RAB") remuneration system for the transmission and distribution of electricity, and the transmission and distribution of natural gas. Operators receive a regulated remuneration; derived from tolls collected for the use of transmission and distribution networks governed by sector-specific legislation and overseen by the National Commission on Markets and Competition (Comisión Nacional de Mercados y la Competencia, the "CNMC"), the independent national regulator. The CNMC retains significant functional independence, as demonstrated when it approved the 2026–2031 electricity transmission and distribution remuneration methodology notwithstanding the contrary advisory opinion of the Council of State.

The framework establishes a "reasonable return" guarantee (rentabilidad razonable) as a core legal principle, designed to provide investors with revenue predictability over multi-year periods. Remuneration is set by the CNMC through binding methodological decisions updated at each six-year regulatory review, determining recoverable costs and the allowed return on the regulated asset base expressed as a "financial remuneration rate" (tasa de retribución financiera) calculated using a weighted average cost of capital ("WACC") methodology. In December 2025, the CNMC approved the new methodology for electricity networks for the 2026–2031 period, setting the remuneration rate at 6.58%, an increase from the previous 5.58%. This new remuneration rate has been criticised by operators as insufficient to underpin the investment required for the energy transition, although they have recently acknowledged that it has led to an increase in their gross operating profit in the first quarter of 2026.

  • Effectiveness: The RAB framework enables network operators to secure lower-cost and investment-grade debt financing. For institutional investors, this provides a stable, long-term and predictable income profile, making operational network assets an attractive asset class. This financial stability and lower cost of capital ultimately benefit consumers through more efficient network.

  • Challenges: While early indications on gross operating profit of operators suggest that the 2026–2031 electricity remuneration methodology may be yielding more positive results than the sector initially anticipated, concerns may persist that the current WACC does not adequately reflect the high-interest-rate environment, creating a risk of capital reallocation towards more remunerative markets. Furthermore, the framework is primarily oriented towards the remuneration of existing, operational infrastructure, limiting its effectiveness in de-risking new large-scale greenfield projects where investors cannot begin earning a return until the asset is fully operational.

Revenue support and tax incentives

The principal mechanism for revenue support for electricity generation is the Renewable Energy Economic Regime (Régimen Económico de Energías Renovables, "REER"), a competitive auction system under which generation capacity is allocated by the Ministry for Ecological Transition, with successful bidders receiving a regulated remuneration that supplements market revenues and provides protection against wholesale price volatility. The REER was preceded by the Specific Remuneration Regime (Régimen Retributivo Específico, "RECORE"), under which the last auctions were held in 2017 and which continues to apply to capacity awarded in those rounds.

A distinctive feature of the REER is its time-limited support structure — with remuneration periods of between 10 and 30 years — which naturally lends itself to a two-phase investment model: a first phase benefiting from the price certainty of the auction award, followed by a second phase exposed to merchant market prices. This structure allows developers to underpin project financing during the most capital-intensive early phase of a project's life, while enabling investors with a higher risk tolerance to factor in upside from merchant exposure when constructing return projections. Looking ahead, the anticipated introduction of a formal capacity market mechanism represents a potentially significant new avenue for private investment in flexible and dispatchable infrastructure — an opportunity brought into sharper relief by the nationwide blackout of April 2025, which exposed the systemic risks of high intermittent renewable penetration in the absence of adequate firm capacity incentives.

The tax framework applicable to the infrastructure sector broadly mirrors that applied to other businesses, though Spanish tax law includes a number of regimes that (while not sector-specific) are particularly relevant to infrastructure investors. Non-resident investors can structure investments through Spanish Venture Capital Entities (Entidades de Capital Riesgo), allowing income received by non-resident investors, both dividends and capital gains, to fall outside the scope of Spanish taxation. Infrastructure groups with a Spanish top holding company commonly use the Spanish holding company regime (Entidades de Tenencia de Valores Extranjeros), under which dividends and capital gains attributable to non-Spanish business are treated as not subject to tax in Spain. At the asset level, Spanish Corporate Income Tax allows full depreciation in accordance with applicable tables; special depreciation plans (planes especiales de amortización) agreed with the tax authorities can better reflect the operational profile of specific infrastructure assets, and finance lease arrangements can further accelerate depreciation and improve investor returns.

  • Effectiveness: When first implemented, the REER auction framework (as so did the RECORE) played a significant role in mobilising private investment in renewable generation and contributed to maintaining Spain as one of the leading European markets for solar and wind deployment. The combination of certain price certainty, inflation linkage and the two-phase revenue structure proved attractive to institutional investors seeking long-duration, index-linked income streams and enabled project developers to secure project finance at higher leverage ratios and lower interest rates.

  • Challenges: The practical effectiveness of the REER has been materially constrained in recent years. No auctions have been held since 2022, creating a significant gap in the pipeline of new supported capacity and reducing revenue visibility for projects currently in development. In the auctions that were held, reserve prices were broadly considered below the levels required to attract investment, effectively deterring participation. The REER has also traditionally lacked automatic inflation indexation, making long-term commitments in a high-inflation environment structurally less attractive. RECORE projects face the additional challenge of growing exposure to price cannibalism: as renewable penetration increases, periods of zero or negative wholesale electricity prices have become more frequent, and the RECORE framework did not provide remuneration during such periods, a gap partially addressed by measures introduced in October 2025.

Government investment

The Spanish government offers a range of funding opportunities for infrastructure development, deployed alongside or independently of the revenue support mechanisms described above. These include grant co-financing, concessional lending, loan guarantees, and direct equity participation in assets of strategic national importance.

The primary vehicle for public co-investment in infrastructure is the Recovery, Transformation, and Resilience Plan (Plan de Recuperación, Transformación y Resiliencia), Spain’s national implementation plan for the EU's NextGenerationEU fund. With a total allocation of over €163 billion, it has channelled significant public resources towards infrastructure-relevant sectors, principally, ecological transition and digitalisation. A key instrument for structuring this co-investment has been the Strategic Projects for Economic Recovery and Transformation (Proyectos Estratégicos para la Recuperación y Transformación Económica, PERTE) framework. PERTEs are large-scale public-private initiatives designated as projects of strategic national importance, providing access to prioritised public funding, streamlined administrative processing and enhanced coordination between government and the private sector. 

The “Spain Grows” (España Crece) fund announced for the period beyond 2026, is expected to mobilise up to €120 billion through grants, guarantees and concessional financing, with anticipated investment pillars including energy transition, industrial decarbonisation, strategic infrastructure and digitalisation.

Alongside these instruments, and in direct response to the April 2025 nationwide blackout, the Government has announced a planned electricity transmission network investment programme of approximately €13.6 billion. The programme –which remains subject to formal approval, with the relevant Royal Decree currently in public consultation– would significantly increase the regulated investment ceiling for transmission and distribution networks, targeting grid reinforcement, new demand connections and resilience improvements.

  • Effectiveness: For private investors and project sponsors that have accessed PRTR instruments, grant co-financing has reduced the quantum of private capital at risk and improved project internal rates of return. Public guarantees lower the credit risk perceived by commercial lenders, reducing financing costs and the overall cost of debt. Direct equity participation by public entities signals government commitment and shares downside risk with private co-investors; particularly significant for capital-intensive early-stage technologies such as green hydrogen where commercial viability is not yet fully established.

  • Challenges: The PRTR is approaching the end of its programming cycle, raising a structural question about the continuity of public co-investment beyond 2026. Its successor, the "Spain Grows" fund , is intended to fill this gap, but its specific instruments and co-investment mechanics remain under development, with limited visibility at this stage on its precise terms and conditions. More broadly, the availability of public support remains project-specific and dependent on government priorities, creating uncertainty for investors seeking replicable frameworks across a broader project pipeline. Additionally, while the planned €13.6 billion electricity transmission network investment programme signals a significant pipeline of remunerated investment, the underlying Royal Decree remains in public consultation and has not yet been formally approved, leaving the quantum and regulatory treatment of investable opportunities uncertain.

Policy and operational regulation

Permitting processes have historically acted as one of the most significant bottlenecks for infrastructure investment in Spain, requiring developers to navigate multiple layers of state, regional and local authorisation –in some cases, involving sequential rather than parallel procedures–before a project can reach financial close. Several measures have been adopted in recent years to address this.

The most structurally significant is the introduction in March 2026 of a general regime for Strategic Investment Projects (Proyectos Estratégicos de Inversión), applicable to any investment that enhances technological capabilities and meets a public interest threshold. The designation carries a package of facilitation measures including streamlined grid access and connection procedures, priority processing of administrative permits and preferential access to public funding instruments. In the energy sector, following the April 2025 blackout, a Royal Decree declared administrative procedures for certain hybrid electrochemical storage projects to be of urgent public interest, where no full environmental impact assessment is required, such projects benefit from halved processing timelines and a series of procedural simplifications. Projects qualifying under the PERTE framework similarly benefit from accelerated environmental impact assessment procedures with reduced statutory processing deadlines.

  • Effectiveness: Together, these measures represent a meaningful improvement in the risk profile of development-stage investment for private capital, reducing timeline risk; a primary driver of cost overruns and return erosion — and improving capital deployment velocity.

  • Challenges: The Strategic Investment Project regime remains pending further regulatory development and its practical impact will depend on implementation. The multi-layered nature of Spain's decentralised administration, requiring coordination across national, regional and local authorities — means that reform at the national level does not automatically resolve consenting complexity at the regional and local tiers.

Public Private Partnership

Spain has a well-established tradition of public-private partnership, primarily through the concession contract model embedded in its public procurement framework. Two principal structures apply: the public works concession (contrato de concesión de obras), under which the concessionaire finances, constructs and operates infrastructure at its own risk in exchange for the right to collect revenues from users or the public authority; and the public service concession (contrato de concesión de servicios), under which a private operator manages a public service at its own commercial risk. Concession terms can extend to 40 years for public works concessions involving construction and up to 25 years for service concessions — providing the long-term revenue horizon that underpins project financing structures.1 The model has been deployed across toll motorways, ports, urban transport and wastewater services at all three levels of Spain's decentralised administration, creating a diverse and active PPP market.

A defining feature of the Spanish concession model is the statutory right to economic rebalancing (restablecimiento del equilibrio económico-financiero), which applies where the financial equilibrium of the concession is disrupted by the public authority's exercise of unilateral modification powers, decisions that substantially affect the economics of the contract, or force majeure and unforeseen events. These mechanisms provide meaningful legal protection for investors against extreme risk outcomes and have been upheld by the courts in a number of significant cases. Looking ahead, the 2025 Sustainable Mobility Act mandates approval of a new concession map for state bus services and requires that tendering procedures be initiated once approved, creating a time-bound pipeline of new concession opportunities.

  • Effectiveness: The Spanish concession model, when well-structured, provides investors with long-term, contractually secured revenue streams and a legal environment that offers meaningful protection against unilateral adverse action by public authorities. The whole-life cost incentive inherent in the model — with a single entity responsible for both construction and long-term operation, creates a strong incentive to optimise asset quality during construction to minimise lifecycle costs.

  • Challenges: The interaction between the 2015 Deindexation Law, which prevents automatic adjustment of contract prices based on CPI, and the high-inflation environment of recent years has created financial fragility in a number of existing concessions and increased the frequency of rebalancing disputes. More broadly, the model faces the inherent challenges of long-term contracting: political pressure to limit tariff increases, renegotiation complexity and policy discontinuity across multiple electoral cycles, compounded by the absence of a dedicated central PPP coordination authority at national level.

Infrastructure pipeline

Spain does not operate a centralised, publicly accessible infrastructure pipeline consolidating project-level information across sectors into a single investor-facing tool — a structural gap that limits its ability to attract foreign direct investment at scale compared to peer jurisdictions. Pipeline visibility must therefore be constructed from a combination of sector-specific planning frameworks and public procurement channels.

The energy sector benefits from the most developed planning infrastructure. The National Energy and Climate Plan 2023–2030 provides the macro-level investment signal, setting binding national targets for renewable capacity, energy efficiency and emissions reduction. More operationally useful is the Electricity Transmission Network Plan, published on a rolling basis in coordination with the transmission system operator Red Eléctrica de España ("REE"), which provides a forward view of planned network investment, identifies existing bottlenecks and signals where private investment in generation and storage assets will be able to connect to the grid and on what timeline. REE supplements this with two publicly accessible interactive tools: a map of current transmission network projects and a dedicated platform mapping the full pipeline of projects under the current planning period by category.

Across all sectors, the Public Sector Procurement Platform (Plataforma de Contratación del Sector Público) publishes all public tender notices, contract awards and related documentation across state, regional and local contracting authorities; providing a transparent and legally mandated record of procurement activity. The PERTE framework adds a meaningful forward-looking dimension: PERTE designations and their associated updates are publicly accessible, providing advance notice of sectors and projects in which the government intends to concentrate public co-investment and administrative facilitation.

Risk allocation and predictability of returns

The support mechanisms described above improve risk allocation and return predictability in distinct ways.

  • RAB model: The RAB framework eliminates the two principal risks that would otherwise deter long-term capital, volume risk and market price risk, by ensuring that the operator's capital expenditure is recovered through a stable, regulated tariff over the asset's useful life, regardless of fluctuations in energy demand or wholesale market prices. This creates a highly predictable return environment in which the primary residual risk is operational efficiency. By providing revenue stability over long regulatory periods, the RAB framework supports access to lower-cost, investment-grade debt financing — significantly reducing the overall WACC and enhancing financial viability and returns for equity investors.

  • REER mechanism: The REER eliminates merchant market price risk for renewable generators. If the market price falls below the predetermined "strike price" agreed in the auction, the government pays the difference to the investor; if the market price is higher, the investor pays the surplus back to the system. This two-way contract for difference provides price stability by shielding investors from wholesale electricity price volatility, enabling more accurate financial modelling and supporting higher leverage at lower interest rates from debt providers — directly translating to a higher return on equity for the developer.

  • Government investment: Public co-investment mechanisms directly improve the risk-return profile of infrastructure projects by absorbing risks that private capital alone would not accept at viable return levels. Grant co-financing reduces the quantum of private capital at risk and improves project returns. Guarantees provided by public financial institutions lower the credit risk perceived by commercial lenders, reducing financing costs and the overall cost of debt. Direct equity participation signals government commitment and shares downside risk with private co-investors.

  • PPP: The Spanish concession framework allocates risks to the party best placed to manage them. Construction and operational risk sit with the private concessionaire, which has the strongest incentives to manage these efficiently. Demand risk can be allocated to the public authority through availability-based structures. The statutory right to economic rebalancing provides a contractual safety net that mitigates the risk of adverse unilateral action by the public authority — reducing the tail risk that would otherwise attract a significant risk premium from private investors.

Recent legal and regulatory change

Retroactive or quasi-retroactive change

The most significant episode of retroactive regulatory change in Spain relates to the renewable energy sector. Between 2010 and 2014, the government progressively and substantially changed the existing remuneration scheme for renewable energy on which a large volume of renewable energy investments had been financed and developed, through retroactive taxation, changes to inflation indexation and ultimately drastically reducing the internal rate of return on existing projects. No measures of comparably retroactive character have been introduced since.

(ii) Recent changes and their impact on investment

More recently (between five and three years ago, as no such measures have been introduced since then), two categories of changes (while not retroactive) have introduced regulatory uncertainty during periods when investors had reasonable expectations of stability. In the energy sector, the government has on more than one occasion intervened to limit or extract revenues from energy companies operating under existing regulatory frameworks, whether through temporary taxes on turnover or through mechanisms reducing the market revenues of electricity generators that do not emit CO2 during certain periods of high wholesale prices. Second, in the residential real estate sector, legislative intervention to cap rental income and limit indexation on existing contracts has altered the economics of investments already made.

Part Two
Regulatory environment
Foreign investment screening, merger control and sector-specific regulators.

Summary of regulatory environment

Investors in Spanish infrastructure navigate a broad but efficient regulatory landscape. The expansive FDI regime mandates suspensory filings for critical infrastructure and captures non-EU investments (temporarily, certain EU investments too) over 10%. Despite this wide net, the FDI regime foresees certain exemptions and reviews are typically predictable, with most infrastructure deals clearing unconditionally or with targeted commitments. For reference, generally less than 10% of deals are cleared subject to remedies. On merger control, where Spain stands out for its alternative turnover and market share thresholds, the integrated National Commission for Markets and Competition (CNMC)—both an antitrust and sectoral "super regulator"— has developed a nuanced approach to merger control review. It offers accelerated 15-business day reviews for straightforward cases, provided the notifying party engaged in pre-notification discussions, or intensified review for more complex deals. Most infrastructure deals are cleared unconditionally, although targeted remedies have been offered where relevant overlaps posed a challenge. Overall, less than 7% of filings in all sectors are cleared with remedies. Most notably, and unlike some other competition regulators, the CNMC is open to behavioural remedies, where relevant. Looking ahead, investors should monitor draft legislation – currently stalled – to re-establish a standalone National Energy Commission (CNE), potentially adding another layer of sector-specific M&A scrutiny in the energy sector.

How burdensome is the FDI regime in this jurisdiction, and are there any notable trends relating specifically to infrastructure investment?

The Spanish FDI regime2 casts a wide net over foreign investment, though the review process generally remains efficient and predictable in practice. The regime is applicable to acquisitions of at least 10% of the share capital, or the attainment of control over a Spanish company or part of it by a non-EU/EFTA investor. Furthermore, a temporary regime, which remains in force until 31 December 2026 captures EU/EFTA investors (including Spanish residents beneficially owned by EU/EFTA residents) acquiring a listed company in Spain or a private company where the investment value exceeds EUR 500 million (GBP 428.4 million).

Mandatory filings3 are triggered when targets operate in defined strategic sectors – most notably critical infrastructure (whether physical or virtual) across energy, transport, water, telecommunications and data processing or storage – or deal in critical technologies or sensitive information, among others. Alternatively, mandatory filings can be triggered based on the investor’s profile, such as state-backed entities or those posing public security risks, irrespective of the target’s activities. The mandatory regime is strictly suspensory; any investment carried out without prior approval: (i) renders the transaction invalid in Spain; and (ii) may carry significant fines ranging from EUR 30,000 (GBP 25,700) to the transaction’s full financial value.

Despite the regime’s expansive scope, review by the regulator4 is typically straightforward and efficient and intervention remains limited. Most transactions are cleared within the statutory three-month review period, with an average review time of 72 calendar days from filing in 2024. While decisions are not public, the regulators statistics show only 6.6% of cases (46 out of 696) have been subject to remedies since the regime was established in 2020 and only two have been prohibited.5 While infrastructure deals command significant scrutiny – accounting for 22.8% of analysed transactions in the 2023-2025 period across the energy, transport, and telecommunications sectors6 – most clear unconditionally, aided by specific sectoral exemptions. Where remedies are required, recent cases such as Zegona’s acquisition of Vodafone España (2024) show these are sector-specific and targeted. In this case, public sources show the transaction was cleared subject to guaranteed 5G investments, service continuity, financial solvency, and maintenance of strategic public contracts.7 Only one FDI notification was blocked by the regulator in 2024 due to the existence of public interests risks that could not be mitigated via remedies,8 and no notifications were blocked in 2025.9

What is the latest public policy direction for merger control in this jurisdiction, particularly regarding any trends relevant for infrastructure investment?

Spain’s merger control landscape is governed by the CNMC and has remained broadly stable in recent years. The regime largely mirrors the EU Merger Regulation operating with mandatory turnover and market-share thresholds tests, strict standstill obligations and significant penalties for gun-jumping. As part of its latest policy developments, the CNMC has developed AI tools to detect gun-jumping cases, which is one of its enforcement priorities.

2023 reforms made to the Spanish merger control regime show that the regime is bifurcating to ensure both efficiency and rigour:

  • Accelerated timelines for straightforward cases: For non-problematic transactions qualifying for the simplified procedure, pre-notification engagement reduces the statutory review period to 15 working days from one month, with clearance typically obtained even sooner in practice.

  • Intensified scrutiny for complex cases: Conversely, complex deals are subject to an increased level of scrutiny both in Phase 1 and Phase 2. In Phase 1 cases, the CNMC is increasingly resorting to market investigations with third parties. Moreover, the number of cases subject to remedies has increased over the past years – from 16 between 2020-2022 to 20 between 2023-2025 - with Phase 2 reviews increasing from 5 to 8 during the same periods. In 2025, the CNMC also prohibited a transaction (Curium/IRAB) for the first time since its creation in 2013.

Despite robust enforcement, the CNMC maintains a pragmatic stance, willing to clear transactions with targeted commitments - including behavioural remedies, showing increased flexibility compared with other regulators. While most deals in the infrastructure sector have been unconditionally cleared, the CNMC has imposed structural remedies in cases such as Indigo/Parkia (2024) or Cepsa/Ballenoil (2024), where the concerns were local overlaps in assets or capacity.

Looking ahead, infrastructure deals in the energy sector might soon be subject to an additional sector-specific notification and review mechanism. Proposed legislation would re-establish a standalone CNE with supervisory functions over acquisitions involving regulated activities and strategic energy assets. However, the scope of this bill and its passage is unclear due to a current lack of political consensus.

What is the record of sector-specific regulators overseeing infrastructure sectors in this jurisdiction and are there any key or upcoming developments to highlight?

Spain’s infrastructure sectors are generally also overseen by the CNMC, which acts with organisational and functional autonomy and is subject to both parliamentary and judicial oversight. Since 2013, the CNMC has combined national competition law enforcement with sector-specific regulatory functions covering energy, telecommunications, post, audiovisual and transport sectors.

While competition and sector-specific expertise are housed within a single regulator, there are separate internal chambers at the decision-making body and specialised directorates for case handling. This integrated structure reduces the need for formal inter-agency coordination where a transaction concerns a regulated sector, subsequently fostering efficiency. Prior to the creation of this “super regulator” in 2013, the competition regulator was required to request ad hoc reports from sectoral regulators for transactions in their sectors. The request for these reports could stop the clock for merger control reviews for up to three months.

CNMC Decisions can be challenged before the Spanish High Court, one of Spain’s highest judicial bodies, whose decisions would only be subject to review – subject to a strict test for admissibility – by the Spanish Supreme Court.

The CNMC’s current priorities are aimed at digitalisation and reinforced monitoring of digital markets, with a cross-cutting focus on consumer protection and the green transition. According to CNMC’s action plans, infrastructure-specific objectives include, (i) ensuring access to physical infrastructure and broadband quality and (ii) rail liberalisation and infrastructure access.

As noted in response to the question above, the proposed legislation to re-establish the CNE would introduce another layer of sector-specific scrutiny for energy infrastructure M&A (alongside merger control and FDI screening), specifically impacting regulated activities, electricity operators, gas-system technical management, hydrocarbon activities, and certain strategic energy assets.

Similarly, parallel legislation proposed in March 2025 on democratic governance in digital services and media contemplates the creation of two new distinct directorates within the CNMC: (i) a Directorate for Digital Services and (ii) a Directorate for Media. Similarly to the CNE bill, this proposed legislation has been repeatedly postponed and its final scope remains uncertain.

FDI and MC overview for 2025

FDI & merger control regime overview, 2024/25
Spain FDI
Mandatory?
Yes10
Voluntary?
No11
Review period(s)

3-month statutory deadline and RFIs stop the clock.

For voluntary consultations, 30 working days.

Number of notifications
19612
Non-notified deals called-in
N/A
In-depth investigations
N/A13
Remedies cases
1414
Blocked cases
015
Abandoned cases
716
Spain MC
Mandatory?
Yes17
Voluntary?
No18
Review period(s)

Phase 1: 1 month (15 working days for simplified procedure with pre-notification)19

Phase 2: 3 months20

Phase 3: up to one month and 15 working days.

RFIs stop the clock. Customary pre-notification.

Voluntary consultations: 1 month.

Number of notifications
12021
Non-notified deals called-in
122
In-depth investigations
115 (Phase 1); 5 (Phase 2)23
Remedies cases
2 (Phase 1); 5 (Phase 2)
Blocked cases
1
Abandoned cases
2

Endnotes

  1. These are the maximum durations, including extensions; and where shorter time limits are specified in the tender documentation, the time limits set out in the tender documents may only be extended by 15% of their initial duration in order to restore the economic balance of the contract.↩︎

  2. Law 19/2003, of July 4, on the Legal Regime of Capital Movements and Foreign Economic Transactions; and Royal Decree 571/2023, of July 4, on Foreign Investments.↩︎

  3. Where a filing requirement is unclear, the rules foresee a voluntary 30-working day consultation procedure.↩︎

  4. Sub-Directorate General for Foreign Investment of the Spanish Ministry of Economy, Trade and Business.↩︎

  5. Spanish Ministry of Economy, Trade and Business, “Foreign Investment Control in Spain 2025”. May 2026. Available at this link (hereinafter, the Annual Report 2025), page 10. Last accessed: 8 June, 2026.↩︎

  6. Annual Report 2025, page 14. See also Spanish Ministry of Economy, Trade and Business, “Foreign Investment Control in Spain 2024”. April 2025. Available at this link (hereinafter, the Annual Report 2024), page 12. Last accessed: 8 June, 2026; and “Foreign Investment Control in Spain 2023”. June 2024. Available at this link, page 20. Last accessed: 8 June, 2026.↩︎

  7. Another example is the 2021 conditional clearance of IFM’s investment in Naturgy, which was subject to commitments including supporting the energy transition, not divesting Naturgy’s subsidiaries to maintain its energy and gas transportation and distribution activities, maintaining Spanish headquarters, stock exchange listing and workforce, and ensuring financial solvency through strict dividend and debt limits.↩︎

  8. See the Annual Report 2024, page 8.↩︎

  9. See the Annual Report 2025, page 10.↩︎

  10. Mandatory notification for acquisitions of at least 10% of share capital or control of a Spanish company or part of it by investors who are (or whose beneficial owners are) non-EU/EFTA residents, if the target is active in sensitive sectors or the investor meets certain criteria (irrespective of the target’s activities); or by EU / EFTA residents where the target is a company listed in Spain or a private company and the investment is above EUR 500 million (GBP 428.4 million), if the target is active in sensitive sectors.↩︎

  11. However, voluntary consultation available to clarify if a transaction is subject to the mandatory regime.↩︎

  12. See the Annual Report 2025, page 9. Of the 196 authorization requests received, 186 were formally analysed by the regulators, 7 were withdrawn, and 3 were due to errors. Within the 186 filings reviewed, 181 were requests for clearance and 5 were requests for a deadline extension for prior authorizations. Within the 181 requests for clearance, 51 case files were closed (i.e., deemed not subject to the FDI regime) and 130 were subject to review. Additionally, 36 voluntary consultations were received.↩︎

  13. The Spanish FDI regime does not foresee an in-depth review of transactions.↩︎

  14. See the Annual Report 2025, page 9. Within the 130 filings subject to review, 14 were cleared with remedies.↩︎

  15. See the Annual Report 2025, page 9. No authorization request was denied due to the existence of public interests risks that could not be mitigated via remedies.↩︎

  16. See the Annual Report 2025, page 9. There were 7 operations withdrawn by the applicant, primarily due to case file consolidations.↩︎

  17. Mandatory notification if the market share threshold or the turnover threshold are met.↩︎

  18. However, voluntary consultation available to clarify if a transaction is subject to merger control.↩︎

  19. This period is extendable 10 days if commitments are offered.↩︎

  20. This period is extendable 15 days if commitments are offered.↩︎

  21. This is the number of cases on which the CNMC adopted a decision. According to the CNMC’s database, 109 filings were made during 2025.↩︎

  22. Note: both the Spanish FDI and Merger Control regimes are mandatory. Under the merger control regime, the “calling in” of a transaction typically involves an infringement for failure to notify and a breach of the standstill obligation. These cases trigger sanctioning proceedings and involve significant fines. In 2025, the CNMC called in for the notification of the acquisition of sole control over Hospital General de la Santísima Trinidad by HM hospital group.↩︎

  23. These are the number of Phase 1 and Phase 2 clearance decisions. During 2025, the CNMC decided to initiate the Phase 2 review on 8 occasions.↩︎

Contributing partners
Investment landscapeFreshfields
Regulatory environmentFreshfields
For more information on GIIA’s work in this jurisdiction, please contact the GIIA policy team.